Office
Connectivity, workstations and selected lighting.
Solution · Business
Keep the processes that matter to you running during an outage — with clear priorities and real load assessment.

The system is selected by what must operate, for how long, and which peak loads the equipment may produce.
Connectivity, workstations and selected lighting.
Continued service and priority equipment.
Router, network node, CCTV or other selected systems.
Technical assessment
MUDMI does not define autonomy from a single number. We consider continuous and peak loads, operating patterns and future expansion needs.
Operating time and system capability are confirmed only after the final configuration and actual loads are known.